Yenibosna Çobançeşme Stream Rehabilitation and Infrastructure Work
Yenibosna/İstanbul | 1995-1996

Project Description:
Rainwater collected in the Hürriyet neighborhood of Bahçelievler will be connected to the Ayamama Stream by laying 300-meter reinforced concrete pipes under the E5 highway.

Project Year: 1995-1996
Project Location: Yenibosna, Istanbul
Length of Pipeline: 450 meters